Ahmedabad Real Estate News

Property records, and the money behind them

News and analysis only. Published by Kamal Thakkar & Co., loan consultants — Ahmedabad property read from the lending side. We do not buy, sell, rent, lease or broker property. We are not realtors, builders or developers, and we hold no interest in any transaction we report.

Area profile

Area profile: Science City and the Ognaj–Chharodi belt

September 2026 · 5 min read

Twenty registrations in six months, and a pattern in them that separates this belt clearly from the rest of the city.

What counts as the belt

Science City is a landmark rather than a locality, so the belt around it is what matters: Ognaj, Chharodi, Gota, Bhadaj, Sola and Hebatpur, running along the Science City approach and out toward the ring road. Project addresses in the record cite these names, often together in a single TP scheme reference.

The registration pattern

20registrations, Dec 2025 – May 2026
10residential / group housing
7mixed development
2plotted development

Half the registrations here are purely residential group housing. That is a materially higher residential share than the western premium corridor, where mixed development dominates.

The belt is also where plotted development appears. Only three plotted schemes were registered across the whole of Ahmedabad in the period, and two of them are in this belt. Plotted development is a signal worth reading: it happens where land parcels are large enough and regular enough to subdivide, and where buyers will accept building later rather than buying finished.

Together those two facts describe an area still being formed rather than one being filled in.

What makes the belt work

Who the belt suits

The registration mix answers this better than any opinion. Ten group-housing schemes and two plotted developments in six months is the profile of an area absorbing primary residential demand — households buying to live, and buyers willing to take a plot and build.

It is not, on this evidence, a commercial corridor. No purely commercial project registered in the belt over the period.

The honest caveats

Registration counts are supply, not demand. Twenty registrations tell you developers committed to twenty schemes; they do not tell you those schemes sold, or at what price, or whether the belt will absorb what is coming.

Infrastructure timing is the other variable. Belts on a city's growing edge depend on roads, water and drainage arriving on schedule, and that schedule is set by the authorities rather than the developer. Anyone advising a buyer here should check the specific scheme's approval status rather than relying on the belt's overall reputation.

The defensible summary

Twenty projects registered across the Science City belt in six months — half of them group housing, two plotted, none purely commercial. It is absorbing residential demand and it is still being formed rather than filled in.

Every clause there can be checked against the public register, which is the point.

Area-wise registration tables run in every issue, every alternate Saturday. Get the next issue →

Compiled from Gujarat RERA project registrations for Ahmedabad, December 2025 to May 2026. Belt grouping is ours, based on the localities recorded against each project. General information, not investment advice.